Roadworks on South Newsham Road in Blyth
- markellis32
- Mar 6
- 1 min read
We will be carrying out off-peak roadworks on South Newsham Road in Blyth from Monday 10th March until Friday 21st March to install bus stop kerbs and complete footpath works.
The works will include two way traffic lights between 9.30am and 3.30pm on South Newsham Road.
Will the road surfaces be finished by then? If not, how much longer does anyone using the A1061 have to ensure the cones, lumps and bumps?